Dry Shake Floor Hardeners

Packaging details Minimum order quantity Price
25kg/bags 400 bags $11,5
25kg/barrels 400 barrels $15,5
5kg/barrels 1000 barrels $4
1kg/barrels 1000 barrels $2

Key attributes

Industry-specific attributes

Warranty

Lifetime

After-sale Service

Online technical support

Project Solution Capability

Graphic design

Application

Warehouses, factories, workshop, carpark, power plant, port, .. 

Design Style

New technology

Other attributes

Place of Origin

Ho Chi Minh City, Vietnam

Brand Name

LB Chemistry

Model Number

BOT GREEN

Use

Dry shake

Color

Green

Feature

Materials to increase the hardness of warehouse concrete floors

Main Raw Material

Cementitious Admixture & Other Additives

State

Green powder

Waiting time

for walking: 2-3 days
for light trucks: 7-10 days
for normal traffic: 28 days

Consumption

for medium load floors: 3-6 kg/m2
for heavy load floors: >6 kg/m2

Curing

Curing the coating after 4-8 hours, and extend 3-7 days

Shelf life

18 months

Packaging and delivery

Packaging details

25kg/bags. 25kg/barrels. 5kg/barrels. 1kg/barrels. We can production OEM order

Port

Cat Lai port

Supply Ability

Supply Ability

130 ton/tons per month

Lead time

Quantity (tons)

1-27

>27

Lead time (days)

30

to be negotiated

Know your supplier

Product descriptions from the supplier

Overview

 

Features

  • Made in Vietnam
  • Easy and fast way to make concrete floor hard as stone
  • No harmful chemicals
  • Multiple-use
  • Consumption: 3-6 Kilograms / square meters
  • Type: Powder - Green
  • Ready to use. Use as a dry sprinkle
  • For floors of warehouses, factories, basements of apartments, sports halls, working floors, garages

Advantages

  • Increased impact resistance
  • Increase the strength of concrete
  • Long-term protection for concrete floor surfaces.
  • High abrasion resistance
  • Increased impact resistance
  • Increased oil resistance
  • Reduce surface dust, easy to apply, the surface after finishing has a high level of flatness

How to use?

  • BOT should be constructed by professional trowel contractors
  • Immediately after the concrete surface has set (starts to set)
  • Sprinkle the BOT mixture (by hand) onto the wet and leveled concrete surface. Wait for the BOT to absorb moisture on the concrete surface and it is still damp, use the machine to rub the surface evenly (1st rub).
  • Apply a second time as soon as the mixture becomes pliable or when it is about to set. Rub with a low speed trowel. The final rub (if necessary) should be done immediately after, but the trowel runs at high speed

Safety and Precaution

  • Please check all specifications before use.
  • Keep out of reach of children.
  • Protective gloves must be worn.
  • BOT is cement base and is therefor alkaline. Suitable precautions should be taken to minimize direct contact with the skin